If you rent from Rochdale Boroughwide Housing (RBH) and live with unfixed damp, mould or disrepair, you may have a compensation claim. One of RBH's severe Housing Ombudsman findings in 2025-26 concerned damp and mould.[8] In March 2025 the Regulator of Social Housing removed its 2022 regulatory notice, issued after Awaab Ishak's death.[2]
“Through this engagement RSH has sought assurance that Rochdale Boroughwide Housing's new leadership team has strengthened the way the organisation is run, to address the failings which led to Awaab Ishak's tragic death and improve its service to tenants.”[4]
Regulator of Social Housing (GOV.UK), RSH publishes regulatory judgements for seven landlords (26 March 2025)
The fastest free route is usually to complain to Rochdale Boroughwide Housing first. Checking whether you may have a claim is also free, and you commit to nothing by asking.
Report repairs and complain to RBH first
Before thinking about any legal claim, report the problem to RBH and, if it is not fixed, complain. It is free, often the fastest way to get repairs moving, and creates a written record of what you reported and when.
Report the repair. Use the MyRBH portal (opens in new tab), email rbh.repairs@rbh.org.uk, or call RBH free on 0800 027 7769. For an emergency in the evening or at the weekend, call the same number to reach its out-of-hours team.[18]
Report damp and mould straight away. RBH asks tenants to report every case as soon as they notice it, by the same routes. It says it will inspect to find the cause and, where there is a significant risk to health, aim to act within 24 hours and, if it cannot, may arrange a temporary move.[21]
Then complain, if it isn't fixed. Use the online help centre linked from RBH's complaints page (opens in new tab), email customer.complaints@rbh.org.uk, call the freephone number or write to RBH at Unique Enterprise Centre, Belfield Road, Rochdale, OL16 2UP.[18] Its complaints policy sets out two stages:
- it does not normally accept a complaint about an issue that happened, or was first found, more than 12 months ago, though it may use discretion where there is good reason, such as health and safety;
- it acknowledges a complaint within 5 working days;
- it responds at Stage 1 within 10 working days of acknowledging it;
- you can ask for Stage 2 within 6 weeks of the Stage 1 response, and someone else reviews it;
- it responds at Stage 2 within 20 working days of acknowledging it.[15]
If the complaint doesn't fix it: the Housing Ombudsman. Once you have completed RBH's complaints process, you can go to the Housing Ombudsman.[15] It is free and independent, can order repairs, an apology and compensation, and needs no claims company or solicitor.
Free advice. Shelter and Citizens Advice give free, independent housing advice. A local law centre can tell you whether you qualify for legal aid — available for disrepair that seriously risks health or safety, but not normally for a compensation-only claim.
Could you have a disrepair claim against RBH?
"Disrepair" means problems with your home that your landlord is legally responsible for fixing but hasn't. Common examples include:
- damp and mould
- leaks — from the roof, pipes, or a flat above
- broken heating or no hot water
- rotten or draughty windows and doors
- cracked walls, unsafe ceilings or other structural problems
- faulty electrics.
You may have a claim against RBH if all of these apply:
- RBH is your landlord. Check your tenancy agreement or rent statement for Rochdale Boroughwide Housing Limited. RBH's homes are in the Rochdale local authority area.[1]
- RBH knew about the problem. Usually that means you reported it, so keep your MyRBH repair references, emails, photos and appointment records.[18]
- It failed to fix the problem in a reasonable time. What is "reasonable" depends on the problem — RBH's own published targets, in the FAQs below, are a good guide.
- You were affected — for example, your health suffered, your belongings were damaged, or part of your home became unusable.
What a disrepair claim can cover
A disrepair claim asks a court to deal with two things: the work RBH still has to do, and what living with the problem has cost your household. Depending on the facts, it can cover:
- an order for the work — a court can direct RBH to carry out the repairs;
- distress and disruption — for the months or years spent living with the problem;
- harm to health — such as asthma or a chest condition made worse by damp and mould;
- ruined belongings — clothing, bedding, furniture or flooring spoiled by damp, mould or leaks;
- rooms you couldn't use — a bedroom, kitchen or bathroom left unusable.
The Housing Ombudsman can also order compensation, without a claim and at no cost. In its 2025-26 RBH cases, 18 of the Ombudsman's orders were for compensation, with others for apologies and repairs.[8] In one case, a tenant who had reported repair problems since 2019 complained in August 2023 about a hole in her kitchen ceiling and a cracked wall; RBH did not finish the repairs until May 2024. It offered £100; the Ombudsman found "maladministration in the landlord's level of compensation offered" and ordered £500 in total.[11]
“There was maladministration in the landlord's level of compensation offered in relation to the handling of the repairs.”[11]
Housing Ombudsman Service, Rochdale Boroughwide Housing Limited (202402942) (6 February 2026, 202402942)
What any claim might be worth depends on the evidence, and nobody can honestly put a figure on it before seeing that evidence.
What happens if you start a claim
Step 1 — tell us about the problem. We ask what is wrong in your home, when you first reported it to RBH, what RBH did about it, and how it has affected you and your family. MyRBH repair references, photos and RBH's complaint responses are all useful.
Step 2 — a free written view. We check your answers against the legal tests set out on this page and tell you in writing whether you may have a claim, and how strong it seems. That first conversation costs nothing.
Step 3 — if the case is strong. We connect you with an independent, regulated law firm — and we will be upfront about that before you commit to anything. The firm advises you, writes to RBH formally and usually arranges an independent survey of your home. Most disrepair claims settle out of court.
Complain before you claim. RBH's complaints policy says it will not accept a complaint once legal proceedings have started against it — meaning a claim form has been filed at court.[15] Complaining first keeps that route open and gives RBH the chance to put things right.
Nobody — including us — should press you to sign anything on the doorstep.
Time limits. A disrepair claim is normally treated as a contract claim, with a limitation period of six years from when the landlord should have fixed the problem.[22] A claim for harm to health, such as damp-related breathing problems, usually has a shorter, three-year limit for that part.[22]
How long it takes. Claims take time, so keep reporting and chasing the repairs while any claim goes on.
Living with disrepair in a Rochdale Boroughwide Housing home?
Tell us what's happening in your home and we'll help you work out the right next step.
Frequently asked questions
Rochdale Boroughwide Housing's freephone number is 0800 027 7769, and its out-of-hours team takes emergency repairs on the same number in the evening and at weekends. You can also report a repair on the MyRBH portal or by emailing rbh.repairs@rbh.org.uk. Its other contact number is 01706 274100.
Yes — if RBH knew about the damp or mould (usually because you reported it) and failed to fix it in a reasonable time, you may have a disrepair claim. Section 11 of the Landlord and Tenant Act 1985 covers your home's structure and essential installations, and your home must be fit for human habitation. Since 27 October 2025, Awaab's Law has also set binding timescales for investigating and fixing damp and mould hazards. Complain to RBH first — it is free, and it builds the record a claim relies on.
RBH's repairs policy sets four targets: attend an emergency within 24 hours to make it safe, an urgent repair within 7 calendar days, a routine repair within 28 calendar days, and larger programmed work within 120 calendar days. Where it needs to inspect first, it aims to do so within 14 calendar days. For damp and mould, Awaab's Law's own deadlines also apply.
Awaab's Law requires RBH, like every social landlord, to investigate damp and mould within 10 working days and send you a written summary within 3 working days. It must then make your home safe within 5 working days of the investigation, or within 24 hours for an emergency hazard. The law is named after Awaab Ishak, who died in 2020 from a severe respiratory condition caused by prolonged exposure to mould in his RBH home. Phase 2 — not yet in force — will extend the rules to a wider range of hazards from 30 November 2026.
In 2025-26 the Ombudsman made 3 findings about condensation, damp and mould at RBH: one of severe maladministration, one of maladministration, and one where RBH had already offered reasonable redress. Its overall maladministration rate for RBH was below the national rate and above the rate for landlords of a similar size and type; both figures are on the main Rochdale Boroughwide Housing page.
RBH's own figures show it completed 86.2% of non-emergency repairs within its target times in 2025-26. It says it completed 99.4% of emergency repairs on time. It measured that year against older targets than its current policy, such as 20 working days for a routine repair. In its tenant survey, 85.2% of tenants who had a repair were satisfied with the repairs service.
RBH says it will inspect your home to find the cause, then fix any structural or plumbing problem, improve ventilation and treat the mould where needed. It says it will contact you again after 6, 12 and 18 months to check the problem has not come back. It reports that its damp and mould recurrence rate is now down to 14.9%, from almost 50% when its improvement work began.
RBH says it answered 93% of Stage 1 complaints and 93.4% of Stage 2 complaints within the Ombudsman's timescales in 2025-26, up from 79% and 85.4% the year before. In its own tenant survey that year, 48.6% of tenants who had complained were satisfied with how it was handled.
Not to start with, and not always at all. Reporting repairs, complaining to RBH and going to the Housing Ombudsman are all free and you can do them yourself; the Ombudsman can order repairs, an apology and compensation. A court claim is different: it is normally done through a solicitor, worth considering where serious disrepair has gone on a long time or the free routes have not worked. Remedy Legal is not a law firm: we check whether you may have a claim and, if it is strong, connect you with an independent, regulated law firm.
No — complaining, going to the Ombudsman, or bringing a disrepair claim should not put your tenancy at risk. Most housing association tenants are assured tenants, which means RBH could only evict through a court, on legal grounds — and asking your landlord to meet its legal repair duties is not one of them. Complaining is a formal right under its own published complaints process. Keep everything in writing, keep your reference numbers, and don't be put off.
About this data
Information on this page was last checked on 25 October 2026. Regulatory grades and Ombudsman figures are correct as at the dates shown against each figure and may have changed since. Grades are reviewed and may change.
We aim for accuracy. If you represent this landlord or spot something out of date, contact legal@remedylegal.ai and we will review it promptly.
Remedy Legal is not a law firm and is not regulated by the Solicitors Regulation Authority. We do not carry out reserved legal activities or act as your legal representative. If your case needs a solicitor, we can connect you with an independent, regulated law firm.
Sources
- Rochdale Boroughwide Housing Limited (4607) - Regulatory Judgement: 14 January 2026 (opens in new tab). Regulator of Social Housing (GOV.UK). Checked 25 October 2026; data as at 14 January 2026.
- Rochdale Boroughwide Housing Limited — regulatory judgements (publications page and change history) (opens in new tab). Regulator of Social Housing (GOV.UK). Checked 25 October 2026; data as at 25 October 2026.
- Regulator of Social Housing takes action against Rochdale Boroughwide Housing after investigation finds widespread failings on damp and mould (opens in new tab). Regulator of Social Housing (GOV.UK). Checked 25 October 2026; data as at 15 December 2022.
- RSH publishes regulatory judgements for seven landlords (opens in new tab). Regulator of Social Housing (GOV.UK). Checked 25 October 2026; data as at 26 March 2025.
- How we approach regulatory judgements and gradings (opens in new tab). Regulator of Social Housing (GOV.UK). Checked 25 October 2026.
- Awaab's Law in the social rented sector (opens in new tab). Ministry of Housing, Communities and Local Government (GOV.UK). Checked 25 October 2026.
- Secretary of State statement on social housing standards (opens in new tab). Department for Levelling Up, Housing and Communities (GOV.UK). Checked 25 October 2026; data as at 16 November 2022.
- Landlord Performance Report 2025/2026 — Rochdale Boroughwide Housing Limited (data refreshed May 2026) (opens in new tab). Housing Ombudsman Service. Checked 25 October 2026; data as at 31 March 2026.
- Annual Complaints Review 2025-26 (opens in new tab). Housing Ombudsman Service. Checked 25 October 2026; data as at 31 March 2026.
- Rochdale Boroughwide Housing Limited (202411980) (opens in new tab). Housing Ombudsman Service. Checked 25 October 2026; data as at 26 June 2025.
- Rochdale Boroughwide Housing Limited (202402942) (opens in new tab). Housing Ombudsman Service. Checked 25 October 2026; data as at 6 February 2026.
- About Us (opens in new tab). Rochdale Boroughwide Housing. Checked 25 October 2026.
- How We're Performing (opens in new tab). Rochdale Boroughwide Housing. Checked 25 October 2026; data as at 31 March 2026.
- Annual Report to Customers 2025/26 (opens in new tab). Rochdale Boroughwide Housing. Checked 25 October 2026; data as at 31 March 2026.
- Feedback and Complaints (opens in new tab). Rochdale Boroughwide Housing. Checked 25 October 2026.
- Complaints Policy (April 2026) (opens in new tab). Rochdale Boroughwide Housing. Checked 25 October 2026; data as at 1 April 2026.
- Repairs and Maintenance Policy (November 2025) (opens in new tab). Rochdale Boroughwide Housing. Checked 25 October 2026; data as at 1 November 2025.
- Repairs (opens in new tab). Rochdale Boroughwide Housing. Checked 25 October 2026.
- Repairs FAQ (opens in new tab). Rochdale Boroughwide Housing. Checked 25 October 2026.
- Contact Us (opens in new tab). Rochdale Boroughwide Housing. Checked 25 October 2026.
- Damp and mould in your home (opens in new tab). Rochdale Boroughwide Housing. Checked 25 October 2026.
- Limitation Act 1980 (c. 58), section 5 (time limit for actions founded on simple contract) (opens in new tab). legislation.gov.uk (The National Archives). Checked 20 July 2026.
- Limitation Act 1980 (c. 58), section 11 (special time limit for actions in respect of personal injuries) (opens in new tab). legislation.gov.uk (The National Archives). Checked 20 July 2026.
- The Hazards in Social Housing (Prescribed Requirements) (England) Regulations 2025 (S.I. 2025/1042) (opens in new tab). legislation.gov.uk (The National Archives). Checked 10 July 2026; data as at 27 October 2025.
- Awaab's Law: guidance for social landlords — Timeframes for repairs in the social rented sector (opens in new tab). GOV.UK (MHCLG). Checked 10 July 2026; data as at 27 October 2025.
- Social Housing (Regulation) Act 2023, section 42 (inserting s.10A LTA 1985) (opens in new tab). legislation.gov.uk (The National Archives). Checked 10 July 2026.