An electricity distributor is under a duty—
for the purpose of enabling electricity to be conveyed to or from the premises;
Any duty under subsection (1) includes a duty to provide such electric lines or electrical plant as may be necessary to enable the connection to be used for the purpose for which it is required.
In deciding how to comply with the duties under this section, and in particular in deciding how to prioritise persons requiring a connection, an electricity distributor must have regard to the designated strategic plans.
The duties under this section shall be performed subject to such terms as may be agreed under section 16A for so long as the connection is required.
In this section and sections 16A to 23 and Schedule 5B—
The duties under this section are subject to the following provisions of this Part and any regulations made under those provisions.
In this section, "the designated strategic plans" means the plans or documents designated by regulations made under section 165A(2) of the Energy Act 2023 (functions of the Independent System Operator and Planner relating to network connections).