Subject to subsections (1A) to (2A) below, an electric line shall not be installed or kept installed above ground except in accordance with a consent granted by the appropriate authority.
So far as relating to the installation of an electric line, subsection (1) is subject to section 33(1) of the Planning Act 2008 (exclusion of requirement for other consents for development for which development consent required).
So far as relating to keeping an electric line installed, subsection (1) does not apply if keeping the line installed is authorised by an order granting development consent under the Planning Act 2008.
Subsection (1) above shall not apply—
Subsection (1) above shall not apply in relation to an electric line that—
"Devolved Welsh generating station" means a generating station that—
"Welsh waters" has the meaning given in section 36 above.
A consent under this section—
Any person who without reasonable excuse contravenes the provisions of this section shall be liable on summary conviction to a fine not exceeding level 3 on the standard scale.
No proceedings shall be instituted in England and Wales in respect of an offence under this section except by or on behalf of the Secretary of State.
In this section "appropriate authority" means—