Section 110D: Codes under section 110C: procedure

Water Industry Act 1991 · 1991 c. 56View on legislation.gov.uk

Part IV: SEWERAGE SERVICES — chapter II: PROVISION OF SEWERAGE SERVICES

Before issuing a code under section 110C, the Authority must—

prepare a draft of the proposed code under section 110C, and
consult such persons about the proposed code as it considers appropriate.

The Authority must specify the period ("the consultation period") within which a person may make representations about the proposed code.

Before a code under section 110C prepared by the Authority is issued, the Minister may direct the Authority—

not to issue the code, or
to issue the code with specified modifications.

Subsection (3) is subject to subsections (6) and (7).

In subsection (3) "the Minister" means—

the Secretary of State, so far as a code prepared by the Authority relates to main connection agreements under which—
the main connection into a sewerage system, or
each such connection,

is or would be a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in England for the benefit of another such undertaker;

the Welsh Ministers, so far as a code prepared by the Authority relates to main connection agreements under which—
the main connection into a sewerage system, or
each such connection,

is or would be a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in Wales for the benefit of another such undertaker;

the Secretary of State and the Welsh Ministers acting jointly, so far as a code prepared by the Authority relates to main connection agreements under which one main connection into a sewerage system is or would be—
a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in England for the benefit of a sewerage undertaker whose area is wholly or mainly in Wales, or
a main connection into the sewerage system of a sewerage undertaker whose area is wholly or mainly in Wales for the benefit of a sewerage undertaker whose area is wholly or mainly in England.

If the power under subsection (3) is exercised to give a direction in respect of such main connection agreements as are referred to in paragraph (a), (b) or (c) of subsection (5), it may not be exercised again in respect of such main connection agreements as are referred to in that paragraph.

If the power under subsection (3) to give a direction in respect of such main connection agreements as are referred to in paragraph (a), (b) or (c) of subsection (5) is not exercised on the first occasion on which it may be so exercised, it may not be exercised in respect of such main connection agreements as are referred to in that paragraph on a later occasion.

A direction under subsection (3) must be given within the period of 28 days beginning with the day after the end of the consultation period, and a code in relation to which a direction may be given may not be issued before that period of 28 days has expired.

About this text

This legislation text comes from legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. These source and reuse terms cover the legislation text, not Remedy's commentary.

Reuse reviewed 21 August 2026 under Open Government Licence v3.0.