During a moratorium neither the HCA , nor the Greater London Authority, may—
During a moratorium a disposal of the registered provider's land requires the regulator's prior consent.
Section 149 sets out exceptions to subsection (2).
Consent—
This section does not prevent a liquidator from disclaiming land as onerous property during a moratorium.
In this section "land" includes a present or future interest in rent or other receipts arising from land.