The construction of a gas reception facility is within section 14(1)(e) only if (when constructed)—
The alteration of a gas reception facility is within section 14(1)(e) only if—
"Gas reception facility" means a facility for—
A gas reception facility is within this subsection if—
"Maximum flow rate" means the maximum rate at which gas is able to flow out of the facility.