The construction of a hazardous waste facility is within section 14(1)(p) only if—
The capacity is—
The alteration of a hazardous waste facility is within section 14(1)(p) only if—
The effect is—
The following terms have the same meanings as in the Hazardous Waste (England and Wales) Regulations 2005 (S.I. 2005/894) (see regulation 5 of those regulations)—
"disposal";
"hazardous waste";
"recovery".
"Deep storage facility" means a facility for the storage of waste underground in a deep geological cavity.