A CCA may designate a highway or proposed highway in its area as a key route network road, or remove its designation as a key route network road, with the consent of—
The Secretary of State may designate a highway or proposed highway in the area of a CCA as a key route network road, or remove its designation as a key route network road, if requested to do so by—
A designation or removal under this section must be in writing and must state when it comes into effect.
The Secretary of State must send a copy of a designation or removal under subsection (2) to the CCA in question at least 7 days before the date on which it comes into effect.
A CCA must publish each designation or removal under this section of a key route network road within its area before the date on which it comes into effect.
A CCA that has key route network roads in its area must keep a list or map (or both) accessible to the public showing those roads.
The requirements in section 22(11) and section 30(11)(a) do not apply to provision under section 22(1) and section 30(1) contained in the same instrument so far as that provision—
When a mayor consents under subsection (7)(c), the mayor must give the Secretary of State—
In this section—
"eligible power" has the meaning given by section 22(2);
"key route network road" means a highway or proposed highway designated for the time being under this section as a key route network road;
"proposed highway" means land on which, in accordance with plans made by a highway authority, that authority are for the time being constructing or intending to construct a highway shown in the plans.